# Industrial Network Security Implementation Roadmap
|
||
|
|
## 90-Day Quick Start Guide
|
||
|
|
|
||
|
|
This document provides a practical, step-by-step roadmap for implementing industrial network security in 90 days.
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Overview
|
||
|
|
|
||
|
|
This roadmap is designed for organizations that need to implement basic industrial cybersecurity quickly while working toward full IEC 62443 compliance.
|
||
|
|
|
||
|
|
**Timeline**: 90 days (can be adjusted based on resources)
|
||
|
|
**Goal**: Achieve 70-80% compliance with critical security controls
|
||
|
|
**Based On**: IEC 62443, NIST SP 800-82, CISA Guidelines
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Week 1-2: Quick Assessment
|
||
|
|
|
||
|
|
### Day 1-3: Inventory and Discovery
|
||
|
|
```
|
||
|
|
✓ List all PLCs (model, IP, firmware, location)
|
||
|
|
✓ Create basic network diagram
|
||
|
|
✓ Document who has access (local and remote)
|
||
|
|
✓ List all HMI/SCADA systems
|
||
|
|
✓ Identify critical production systems
|
||
|
|
```
|
||
|
|
|
||
|
|
**Deliverable**: Asset inventory spreadsheet + network diagram
|
||
|
|
|
||
|
|
### Day 4-7: Quick Risk Assessment
|
||
|
|
```
|
||
|
|
✓ Identify top 5 critical assets
|
||
|
|
✓ Rate each asset: Impact (1-5), Likelihood (1-5)
|
||
|
|
✓ Calculate risk scores
|
||
|
|
✓ Prioritize based on risk score
|
||
|
|
```
|
||
|
|
|
||
|
|
**Risk Matrix Template:**
|
||
|
|
| Asset | Impact | Likelihood | Risk Score | Priority |
|
||
|
|
|-------|--------|-----------|-----------|----------|
|
||
|
|
| PLC-REACTOR-01 | 5 (Safety) | 4 | 20 | P1 |
|
||
|
|
| HMI-CONTROL-01 | 4 | 3 | 12 | P2 |
|
||
|
|
|
||
|
|
### Day 8-10: Gap Analysis
|
||
|
|
```
|
||
|
|
✓ Check current security controls
|
||
|
|
✓ Compare against critical requirements
|
||
|
|
✓ Create quick-win list (no downtime needed)
|
||
|
|
```
|
||
|
|
|
||
|
|
**Critical Requirements Checklist:**
|
||
|
|
- [ ] PLC password protection
|
||
|
|
- [ ] IP access control
|
||
|
|
- [ ] Firewall between IT/OT
|
||
|
|
- [ ] Remote access controls
|
||
|
|
- [ ] Backup procedures
|
||
|
|
- [ ] Logging enabled
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Week 3-4: Quick Wins (No Downtime)
|
||
|
|
|
||
|
|
### Tasks That Can Be Done Immediately
|
||
|
|
|
||
|
|
#### 1. Enable PLC Password Protection
|
||
|
|
```
|
||
|
|
Time: 15 minutes per PLC
|
||
|
|
Risk: None
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Steps:
|
||
|
|
1. Open TIA Portal
|
||
|
|
2. PLC Properties → Protection
|
||
|
|
3. Set "Read/Write Protection"
|
||
|
|
4. Create strong password (min 8 chars)
|
||
|
|
5. Document in password vault
|
||
|
|
6. Download to PLC
|
||
|
|
```
|
||
|
|
|
||
|
|
**Password Requirements:**
|
||
|
|
- Minimum 8 characters
|
||
|
|
- Mix of uppercase, lowercase, numbers
|
||
|
|
- Store in secure password manager
|
||
|
|
- Change every 90 days
|
||
|
|
|
||
|
|
#### 2. Configure IP Access Control Lists
|
||
|
|
```
|
||
|
|
Time: 10 minutes per PLC
|
||
|
|
Risk: None (tested before applying)
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Steps:
|
||
|
|
1. List authorized IPs (HMI, Engineering station)
|
||
|
|
2. PLC Properties → Connection mechanisms
|
||
|
|
3. Enable "Permit access only for..."
|
||
|
|
4. Add authorized IPs
|
||
|
|
5. Test from authorized station
|
||
|
|
6. Download to PLC
|
||
|
|
```
|
||
|
|
|
||
|
|
**Example ACL:**
|
||
|
|
```
|
||
|
|
Allowed IPs:
|
||
|
|
- 192.168.10.50 (Engineering Station)
|
||
|
|
- 192.168.10.60 (HMI-01)
|
||
|
|
- 192.168.10.70 (SCADA Server)
|
||
|
|
```
|
||
|
|
|
||
|
|
#### 3. Disable Unused PLC Services
|
||
|
|
```
|
||
|
|
Time: 5 minutes per PLC
|
||
|
|
Risk: Low (test first)
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Disable if not needed:
|
||
|
|
- [ ] Web Server (HTTP/HTTPS)
|
||
|
|
- [ ] FTP Server
|
||
|
|
- [ ] SNMP
|
||
|
|
- [ ] Modbus TCP
|
||
|
|
```
|
||
|
|
|
||
|
|
#### 4. Change Default Passwords
|
||
|
|
```
|
||
|
|
Time: Varies
|
||
|
|
Risk: None
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Change passwords on:
|
||
|
|
- [ ] HMI systems
|
||
|
|
- [ ] SCADA servers
|
||
|
|
- [ ] Network switches
|
||
|
|
- [ ] Firewalls
|
||
|
|
- [ ] Routers
|
||
|
|
```
|
||
|
|
|
||
|
|
#### 5. Enable Logging
|
||
|
|
```
|
||
|
|
Time: 30 minutes
|
||
|
|
Risk: None
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Enable logs on:
|
||
|
|
- [ ] PLCs (if supported)
|
||
|
|
- [ ] Firewalls
|
||
|
|
- [ ] Switches
|
||
|
|
- [ ] HMI/SCADA systems
|
||
|
|
- [ ] Engineering stations
|
||
|
|
```
|
||
|
|
|
||
|
|
#### 6. Create Baseline Backups
|
||
|
|
```
|
||
|
|
Time: 1 hour
|
||
|
|
Risk: None
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Backup:
|
||
|
|
- [ ] All PLC programs
|
||
|
|
- [ ] HMI projects
|
||
|
|
- [ ] SCADA configurations
|
||
|
|
- [ ] Network device configs
|
||
|
|
- Store in 3 locations (network, external drive, off-site)
|
||
|
|
```
|
||
|
|
|
||
|
|
**End of Week 4 Status Check:**
|
||
|
|
- [ ] All PLCs have passwords
|
||
|
|
- [ ] IP ACLs configured
|
||
|
|
- [ ] Unused services disabled
|
||
|
|
- [ ] Default passwords changed
|
||
|
|
- [ ] Logging enabled
|
||
|
|
- [ ] Backups created
|
||
|
|
|
||
|
|
**Expected Compliance: ~40%**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Week 5-6: Basic Network Security
|
||
|
|
|
||
|
|
### Task 1: Install Firewall Between IT and OT
|
||
|
|
```
|
||
|
|
Time: 2-4 hours (includes planning)
|
||
|
|
Risk: Medium (requires downtime)
|
||
|
|
Impact: CRITICAL
|
||
|
|
|
||
|
|
Steps:
|
||
|
|
1. Purchase industrial firewall (or use existing)
|
||
|
|
2. Design firewall rules (whitelist only)
|
||
|
|
3. Schedule maintenance window
|
||
|
|
4. Install firewall
|
||
|
|
5. Configure and test rules
|
||
|
|
6. Document configuration
|
||
|
|
```
|
||
|
|
|
||
|
|
**Basic Firewall Rules:**
|
||
|
|
```
|
||
|
|
ALLOW:
|
||
|
|
- SCADA → PLCs (port 102, S7 protocol)
|
||
|
|
- HMI → PLCs (port 102)
|
||
|
|
- Engineering Station → PLCs (port 102)
|
||
|
|
- Historian → PLCs (read-only)
|
||
|
|
|
||
|
|
DENY:
|
||
|
|
- All other traffic
|
||
|
|
```
|
||
|
|
|
||
|
|
### Task 2: Segment Network with VLANs
|
||
|
|
```
|
||
|
|
Time: 4-8 hours
|
||
|
|
Risk: Medium (test thoroughly)
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
VLAN Structure:
|
||
|
|
- VLAN 10: Control Network (PLCs)
|
||
|
|
- VLAN 20: Supervisory (SCADA/HMI)
|
||
|
|
- VLAN 30: Engineering
|
||
|
|
- VLAN 40: DMZ (Historian)
|
||
|
|
```
|
||
|
|
|
||
|
|
### Task 3: Secure Remote Access
|
||
|
|
```
|
||
|
|
Time: 4 hours
|
||
|
|
Risk: Low
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Implementation:
|
||
|
|
1. Set up VPN server
|
||
|
|
2. Configure VPN client access
|
||
|
|
3. Require strong authentication
|
||
|
|
4. Implement VPN logging
|
||
|
|
5. Document procedures
|
||
|
|
```
|
||
|
|
|
||
|
|
**Remote Access Requirements:**
|
||
|
|
- VPN required for all external access
|
||
|
|
- Strong passwords (12+ characters)
|
||
|
|
- MFA if possible
|
||
|
|
- Session timeout: 4 hours
|
||
|
|
- All sessions logged
|
||
|
|
|
||
|
|
**End of Week 6 Status Check:**
|
||
|
|
- [ ] Firewall installed and configured
|
||
|
|
- [ ] VLANs implemented
|
||
|
|
- [ ] VPN for remote access
|
||
|
|
- [ ] Firewall rules documented
|
||
|
|
|
||
|
|
**Expected Compliance: ~55%**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Week 7-8: System Hardening
|
||
|
|
|
||
|
|
### Task 1: Harden Windows Systems
|
||
|
|
```
|
||
|
|
Time: 2 hours per system
|
||
|
|
Risk: Low
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Apply to: HMI, SCADA, Engineering Stations
|
||
|
|
|
||
|
|
Hardening Steps:
|
||
|
|
1. Install latest Windows updates
|
||
|
|
2. Enable Windows Firewall
|
||
|
|
3. Disable unnecessary services
|
||
|
|
4. Remove unused software
|
||
|
|
5. Configure User Account Control (UAC)
|
||
|
|
6. Enable BitLocker encryption (if available)
|
||
|
|
```
|
||
|
|
|
||
|
|
**Windows Hardening Checklist:**
|
||
|
|
- [ ] Windows Firewall: Enabled
|
||
|
|
- [ ] Windows Update: Enabled (with control)
|
||
|
|
- [ ] SMBv1: Disabled
|
||
|
|
- [ ] RDP: Disabled (unless needed)
|
||
|
|
- [ ] Guest account: Disabled
|
||
|
|
- [ ] Autorun: Disabled
|
||
|
|
- [ ] Screen lock: 15 minutes
|
||
|
|
|
||
|
|
### Task 2: Deploy Antivirus
|
||
|
|
```
|
||
|
|
Time: 1 hour per system
|
||
|
|
Risk: Medium (test for false positives)
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Steps:
|
||
|
|
1. Choose industrial-friendly AV
|
||
|
|
2. Test in non-production first
|
||
|
|
3. Configure exclusions for control apps
|
||
|
|
4. Deploy to all Windows systems
|
||
|
|
5. Enable centralized management
|
||
|
|
```
|
||
|
|
|
||
|
|
**Important**: Some AV can interfere with real-time control systems. Test thoroughly!
|
||
|
|
|
||
|
|
### Task 3: USB Device Control
|
||
|
|
```
|
||
|
|
Time: 2 hours total
|
||
|
|
Risk: Low
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Options:
|
||
|
|
A) Group Policy: Disable USB storage
|
||
|
|
B) Third-party tool: Whitelist approved USB devices
|
||
|
|
C) Physical: USB port locks
|
||
|
|
```
|
||
|
|
|
||
|
|
**End of Week 8 Status Check:**
|
||
|
|
- [ ] All Windows systems hardened
|
||
|
|
- [ ] Antivirus deployed
|
||
|
|
- [ ] USB controls implemented
|
||
|
|
|
||
|
|
**Expected Compliance: ~65%**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Week 9-10: Monitoring and Documentation
|
||
|
|
|
||
|
|
### Task 1: Set Up Basic Monitoring
|
||
|
|
```
|
||
|
|
Time: 8 hours
|
||
|
|
Risk: Low
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Implement:
|
||
|
|
1. Centralized log collection (syslog server)
|
||
|
|
2. Basic SIEM or log analysis tool
|
||
|
|
3. Critical alerts (email/SMS)
|
||
|
|
```
|
||
|
|
|
||
|
|
**Minimum Alerts:**
|
||
|
|
- PLC program download
|
||
|
|
- PLC mode change (RUN/STOP)
|
||
|
|
- Failed login attempts (5 within 1 hour)
|
||
|
|
- Firewall rule violations
|
||
|
|
- Antivirus detections
|
||
|
|
|
||
|
|
### Task 2: Document Everything
|
||
|
|
```
|
||
|
|
Time: 4-8 hours
|
||
|
|
Risk: None
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Create documentation:
|
||
|
|
1. Network architecture diagram (updated)
|
||
|
|
2. Asset inventory (complete)
|
||
|
|
3. Security configuration baselines
|
||
|
|
4. Access control matrix (who has access to what)
|
||
|
|
5. Incident response procedures (basic)
|
||
|
|
6. Backup and recovery procedures
|
||
|
|
```
|
||
|
|
|
||
|
|
**Document Templates in Appendix**
|
||
|
|
|
||
|
|
**End of Week 10 Status Check:**
|
||
|
|
- [ ] Log collection working
|
||
|
|
- [ ] Critical alerts configured
|
||
|
|
- [ ] Documentation complete
|
||
|
|
|
||
|
|
**Expected Compliance: ~70%**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Week 11-12: Policies and Training
|
||
|
|
|
||
|
|
### Task 1: Create Security Policies
|
||
|
|
```
|
||
|
|
Time: 8-16 hours
|
||
|
|
Risk: None
|
||
|
|
Impact: MEDIUM
|
||
|
|
|
||
|
|
Minimum required policies:
|
||
|
|
1. Cybersecurity Policy (overall)
|
||
|
|
2. Access Control Policy
|
||
|
|
3. Password Policy
|
||
|
|
4. Remote Access Policy
|
||
|
|
5. Change Management Policy
|
||
|
|
6. Incident Response Policy
|
||
|
|
```
|
||
|
|
|
||
|
|
**Policy Template Structure:**
|
||
|
|
```
|
||
|
|
1. Purpose
|
||
|
|
2. Scope
|
||
|
|
3. Responsibilities
|
||
|
|
4. Requirements
|
||
|
|
5. Procedures
|
||
|
|
6. Exceptions
|
||
|
|
7. Enforcement
|
||
|
|
```
|
||
|
|
|
||
|
|
### Task 2: Conduct Security Awareness Training
|
||
|
|
```
|
||
|
|
Time: 2-4 hours
|
||
|
|
Risk: None
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Training topics:
|
||
|
|
1. Why security matters in OT
|
||
|
|
2. Password security
|
||
|
|
3. Phishing awareness
|
||
|
|
4. Physical security
|
||
|
|
5. Incident reporting
|
||
|
|
6. USB and removable media risks
|
||
|
|
```
|
||
|
|
|
||
|
|
### Task 3: Create Incident Response Plan
|
||
|
|
```
|
||
|
|
Time: 4-8 hours
|
||
|
|
Risk: None
|
||
|
|
Impact: HIGH
|
||
|
|
|
||
|
|
Plan components:
|
||
|
|
1. IR team contact list
|
||
|
|
2. Incident classification
|
||
|
|
3. Response procedures
|
||
|
|
4. Communication plan
|
||
|
|
5. Escalation matrix
|
||
|
|
```
|
||
|
|
|
||
|
|
**End of Week 12 Status Check:**
|
||
|
|
- [ ] Security policies documented
|
||
|
|
- [ ] Staff training completed
|
||
|
|
- [ ] Incident response plan ready
|
||
|
|
|
||
|
|
**Expected Compliance: ~75%**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Post-90 Days: Continuous Improvement
|
||
|
|
|
||
|
|
### Immediate Next Steps (Days 91-180)
|
||
|
|
|
||
|
|
#### 1. Advanced Monitoring
|
||
|
|
- Deploy IDS/IPS for OT networks
|
||
|
|
- Implement behavior-based anomaly detection
|
||
|
|
- Set up SIEM with custom use cases
|
||
|
|
|
||
|
|
#### 2. Advanced Access Control
|
||
|
|
- Implement multi-factor authentication
|
||
|
|
- Deploy privileged access management
|
||
|
|
- Set up jump servers for remote access
|
||
|
|
|
||
|
|
#### 3. Compliance and Audit
|
||
|
|
- Conduct formal security assessment
|
||
|
|
- Address remaining gaps
|
||
|
|
- Prepare for external audit
|
||
|
|
|
||
|
|
#### 4. Advanced Network Security
|
||
|
|
- Implement data diodes for one-way communication
|
||
|
|
- Deploy industrial firewalls at zone boundaries
|
||
|
|
- Consider zero-trust architecture
|
||
|
|
|
||
|
|
### Long-Term Roadmap (6-12 months)
|
||
|
|
|
||
|
|
**Month 6:**
|
||
|
|
- Full IEC 62443 gap assessment
|
||
|
|
- Penetration testing (test environment)
|
||
|
|
- Update all documentation
|
||
|
|
|
||
|
|
**Month 9:**
|
||
|
|
- Achieve 90% compliance
|
||
|
|
- ISASecure certification preparation
|
||
|
|
- Advanced threat hunting capabilities
|
||
|
|
|
||
|
|
**Month 12:**
|
||
|
|
- External security audit
|
||
|
|
- Full IEC 62443 compliance
|
||
|
|
- Mature security operations center (SOC)
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Budget Estimates
|
||
|
|
|
||
|
|
### Minimal Budget ($5K-$15K)
|
||
|
|
- Basic firewall: $2K-$5K
|
||
|
|
- VPN server/licenses: $1K-$3K
|
||
|
|
- Syslog server (can be free)
|
||
|
|
- Training (internal)
|
||
|
|
- Documentation (internal time)
|
||
|
|
|
||
|
|
### Recommended Budget ($25K-$50K)
|
||
|
|
- Industrial firewall: $10K-$20K
|
||
|
|
- SIEM/Log management: $5K-$10K
|
||
|
|
- Managed switch with VLANs: $3K-$5K
|
||
|
|
- Antivirus licenses: $2K-$5K
|
||
|
|
- Training (external): $3K-$5K
|
||
|
|
- Consulting support: $2K-$5K
|
||
|
|
|
||
|
|
### Full Implementation ($100K+)
|
||
|
|
- Industrial firewalls (multiple): $30K-$50K
|
||
|
|
- IDS/IPS for OT: $20K-$40K
|
||
|
|
- SIEM platform: $20K-$40K
|
||
|
|
- Network upgrades: $10K-$20K
|
||
|
|
- Professional services: $20K-$50K
|
||
|
|
- Training and certification: $5K-$10K
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Success Metrics
|
||
|
|
|
||
|
|
### Week-by-Week Targets
|
||
|
|
|
||
|
|
| Week | Target | Compliance % |
|
||
|
|
|------|--------|--------------|
|
||
|
|
| 2 | Assessment complete | 0% |
|
||
|
|
| 4 | Quick wins done | 40% |
|
||
|
|
| 6 | Network security | 55% |
|
||
|
|
| 8 | System hardening | 65% |
|
||
|
|
| 10 | Monitoring active | 70% |
|
||
|
|
| 12 | Policies and training | 75% |
|
||
|
|
|
||
|
|
### Key Performance Indicators (KPIs)
|
||
|
|
|
||
|
|
**Security Posture:**
|
||
|
|
- % of PLCs with password protection
|
||
|
|
- % of PLCs with IP ACLs
|
||
|
|
- Number of security zones
|
||
|
|
- Firewall rule compliance
|
||
|
|
|
||
|
|
**Operational:**
|
||
|
|
- Mean time to detect (MTTD) incidents
|
||
|
|
- Mean time to respond (MTTR) incidents
|
||
|
|
- % of systems with current patches
|
||
|
|
- Backup success rate
|
||
|
|
|
||
|
|
**Compliance:**
|
||
|
|
- % of IEC 62443 requirements met
|
||
|
|
- Number of open findings
|
||
|
|
- Time to remediate findings
|
||
|
|
- Training completion rate
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Common Pitfalls to Avoid
|
||
|
|
|
||
|
|
### 1. Not Testing in Lab First
|
||
|
|
**Problem**: Changes break production
|
||
|
|
**Solution**: Always test in non-production environment
|
||
|
|
|
||
|
|
### 2. Inadequate Communication
|
||
|
|
**Problem**: Operations surprised by changes
|
||
|
|
**Solution**: Involve ops team from day 1
|
||
|
|
|
||
|
|
### 3. Weak Passwords
|
||
|
|
**Problem**: Easy to guess or crack
|
||
|
|
**Solution**: Enforce 8+ chars, complexity, password manager
|
||
|
|
|
||
|
|
### 4. No Backup Before Changes
|
||
|
|
**Problem**: Can't rollback if needed
|
||
|
|
**Solution**: Backup everything before changes
|
||
|
|
|
||
|
|
### 5. Overly Complex Rules
|
||
|
|
**Problem**: Firewall rules break production
|
||
|
|
**Solution**: Start simple, iterate
|
||
|
|
|
||
|
|
### 6. Ignoring Legacy Systems
|
||
|
|
**Problem**: Old PLCs can't be secured
|
||
|
|
**Solution**: Extra network controls around legacy
|
||
|
|
|
||
|
|
### 7. Documentation Neglect
|
||
|
|
**Problem**: Changes not documented
|
||
|
|
**Solution**: Make documentation part of change process
|
||
|
|
|
||
|
|
### 8. Set and Forget
|
||
|
|
**Problem**: Security degrades over time
|
||
|
|
**Solution**: Regular reviews and updates
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Resource Requirements
|
||
|
|
|
||
|
|
### Personnel
|
||
|
|
|
||
|
|
**Week 1-4 (Quick Wins):**
|
||
|
|
- Control engineer: 40 hours
|
||
|
|
- IT security: 20 hours
|
||
|
|
- Management: 5 hours
|
||
|
|
|
||
|
|
**Week 5-8 (Network Security):**
|
||
|
|
- Network engineer: 40 hours
|
||
|
|
- Control engineer: 20 hours
|
||
|
|
- IT security: 30 hours
|
||
|
|
|
||
|
|
**Week 9-12 (Monitoring & Policies):**
|
||
|
|
- IT security: 40 hours
|
||
|
|
- Control engineer: 20 hours
|
||
|
|
- HR/Training: 10 hours
|
||
|
|
- Management: 10 hours
|
||
|
|
|
||
|
|
### Tools and Software
|
||
|
|
|
||
|
|
**Essential (Free/Low Cost):**
|
||
|
|
- [ ] TIA Portal (for PLC configuration)
|
||
|
|
- [ ] Network mapping tool (e.g., Nmap)
|
||
|
|
- [ ] Syslog server (e.g., syslog-ng)
|
||
|
|
- [ ] Password manager
|
||
|
|
- [ ] Documentation tool (e.g., Markdown)
|
||
|
|
|
||
|
|
**Recommended (Paid):**
|
||
|
|
- [ ] Industrial firewall
|
||
|
|
- [ ] VPN server
|
||
|
|
- [ ] SIEM platform
|
||
|
|
- [ ] Antivirus for OT
|
||
|
|
- [ ] Network monitoring tool
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Appendices
|
||
|
|
|
||
|
|
### Appendix A: Critical Controls Quick Reference
|
||
|
|
|
||
|
|
**Top 10 Critical Controls (Do These First):**
|
||
|
|
|
||
|
|
1. **Enable PLC passwords** - Prevents unauthorized access
|
||
|
|
2. **Configure IP ACLs** - Limits who can connect
|
||
|
|
3. **Install firewall** - Separates IT from OT
|
||
|
|
4. **Change default passwords** - Eliminates easy targets
|
||
|
|
5. **Create backups** - Enables recovery
|
||
|
|
6. **Enable logging** - Provides visibility
|
||
|
|
7. **Disable unused services** - Reduces attack surface
|
||
|
|
8. **Implement VPN** - Secures remote access
|
||
|
|
9. **Deploy antivirus** - Protects Windows systems
|
||
|
|
10. **Train staff** - Human firewall
|
||
|
|
|
||
|
|
### Appendix B: Weekly Checklist Template
|
||
|
|
|
||
|
|
```markdown
|
||
|
|
## Weekly Security Checklist
|
||
|
|
|
||
|
|
Date: __________
|
||
|
|
Completed by: __________
|
||
|
|
|
||
|
|
### Access Control
|
||
|
|
- [ ] No new unauthorized users found
|
||
|
|
- [ ] All remote access via VPN
|
||
|
|
- [ ] No password violations detected
|
||
|
|
|
||
|
|
### Monitoring
|
||
|
|
- [ ] Reviewed critical alerts
|
||
|
|
- [ ] Checked firewall logs
|
||
|
|
- [ ] Verified backup completion
|
||
|
|
|
||
|
|
### System Health
|
||
|
|
- [ ] No unauthorized changes detected
|
||
|
|
- [ ] Antivirus definitions current
|
||
|
|
- [ ] System performance normal
|
||
|
|
|
||
|
|
### Physical Security
|
||
|
|
- [ ] Control room access log reviewed
|
||
|
|
- [ ] No unauthorized access detected
|
||
|
|
- [ ] Equipment cabinets secured
|
||
|
|
|
||
|
|
Notes:
|
||
|
|
__________________________________________
|
||
|
|
```
|
||
|
|
|
||
|
|
### Appendix C: Emergency Contact Card
|
||
|
|
|
||
|
|
```
|
||
|
|
┌─────────────────────────────────────┐
|
||
|
|
│ CYBERSECURITY INCIDENT │
|
||
|
|
│ EMERGENCY CONTACT CARD │
|
||
|
|
├─────────────────────────────────────┤
|
||
|
|
│ INCIDENT COMMANDER: │
|
||
|
|
│ Name: ____________________________ │
|
||
|
|
│ Phone: ___________________________ │
|
||
|
|
│ │
|
||
|
|
│ TECHNICAL LEAD: │
|
||
|
|
│ Name: ____________________________ │
|
||
|
|
│ Phone: ___________________________ │
|
||
|
|
│ │
|
||
|
|
│ OPERATIONS: │
|
||
|
|
│ Name: ____________________________ │
|
||
|
|
│ Phone: ___________________________ │
|
||
|
|
│ │
|
||
|
|
│ VENDOR SUPPORT: │
|
||
|
|
│ Siemens: 1-800-________ │
|
||
|
|
│ Firewall: ____________________ │
|
||
|
|
│ │
|
||
|
|
│ EXTERNAL: │
|
||
|
|
│ ICS-CERT: 888-282-0870 │
|
||
|
|
│ FBI Cyber: ___________________ │
|
||
|
|
└─────────────────────────────────────┘
|
||
|
|
```
|
||
|
|
|
||
|
|
### Appendix D: Pre-Change Checklist
|
||
|
|
|
||
|
|
Before making any security changes:
|
||
|
|
|
||
|
|
```
|
||
|
|
CHANGE: _________________________________
|
||
|
|
DATE: ___________________________________
|
||
|
|
|
||
|
|
PRE-CHANGE:
|
||
|
|
[ ] Change documented and approved
|
||
|
|
[ ] Tested in lab/non-production
|
||
|
|
[ ] Backup created and verified
|
||
|
|
[ ] Operations notified
|
||
|
|
[ ] Maintenance window scheduled
|
||
|
|
[ ] Rollback plan ready
|
||
|
|
[ ] On-call support arranged
|
||
|
|
|
||
|
|
DURING CHANGE:
|
||
|
|
[ ] Follow documented procedure
|
||
|
|
[ ] Document any deviations
|
||
|
|
[ ] Test functionality after each step
|
||
|
|
|
||
|
|
POST-CHANGE:
|
||
|
|
[ ] Verify system functionality
|
||
|
|
[ ] Update documentation
|
||
|
|
[ ] Monitor for 24 hours
|
||
|
|
[ ] Close change ticket
|
||
|
|
|
||
|
|
Sign-off:
|
||
|
|
Engineer: __________ Date: __________
|
||
|
|
Approver: __________ Date: __________
|
||
|
|
```
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
**Document Version**: 1.0
|
||
|
|
**Last Updated**: February 16, 2026
|
||
|
|
**For Use With**: industrial-network-security-guide.md
|